Council Bluffs Interstate System Improvements

Segment 1

Segment 1 begins in Omaha, Neb., just east of the I-80/I-480 system interchange and continues across the Missouri River to just west of the I-80/I-29 west system interchange in Council Bluffs, Iowa. This segment includes improvements to the 13th Street interchange (in Nebraska) and construction of a second bridge over the Missouri River north of the existing bridge. Engineers on the project team are working to develop design plans for Segment 1. Construction on Segment 1 is expected to begin in 2008. The preferred alternative for reconstruction of Segment 1 is shown below.

I-480 to Missouri Bridge - Segment 1

Key features of the Segment 1 improvements are:
  • a minimum of four lanes in each direction on I-80;
  • a new I-80 bridge over the Missouri River for westbound traffic;
  • conversion of the existing I-80 bridge over the Missouri River for eastbound traffic;
  • minor changes to the 13th Street interchange; and
  • reconstruction of the Riverview Boulevard bridge.
Click here to download a PDF (0.9 Mb) with a larger image of the proposed improvements for Segment 1.